Virginia Community College System
Higher EducationVA
Posted
Oct 12, 2026
Nov 12, 2026
Replace Grayson Hall Elevator and Loading Dock (Invitation for Bids)
Replace Grayson hall elevator and loading dock. Project includes the replacement of an existing elevator and the installation of edge of dock leveler at the loading dock. See attached file.
