CountyGA
Posted
-
Nov 19, 2026
Lake McIntosh Dam Structural Repairs RFP
Structural concrete repairs to the dam spillway structure.
Description: Project shall consist of the following work efforts mobilization, safe spillway access, removal of existing joint sealant and replacement in-kind, excavation of existing drainage rills [ref: plan], filter fabric, riprap (rr-5), partial depth concrete repair at spillway, crack sealing at spillway wall, cut of existing anchor bolts and slope restoration.
SpecialDistrict · IL, US
Solicitation files and supporting documents for this bid.
RFP documents aren’t available here yet.
Our team can help you find the original solicitation documents.
Request File RetrievalAdjacent opportunities open for bidding right now.
CountyGA
Posted
-
Nov 19, 2026
Structural concrete repairs to the dam spillway structure.
Lake George Central School District
School DistrictNY
Posted
Apr 22, 2026
Dec 31, 2026
The Lake George Central School District has issued a Request for Proposals for Universal Pre-Kindergarten (UPK) services. This solicitation is aimed at educational service providers within the district's jurisdiction in Warren County, New York. Interested parties are directed to the district's official website for full documentation and submission instructions.
Posted
Oct 14, 2026
Nov 12, 2026
Project includes the installation, maintenance, and removal of erosion and sediment control measures. Installation, implementation, and coordination of traffic control plan, and removal at completion of construction. Stripping and stockpiling topsoil. Demolition of existing concrete dam and associated infrastructure. Control of surface water and dewatering of subgrades in areas of work. Excavation and placement of select fill, topsoil and seeding.
CityMI
Posted
Oct 6, 2026
Nov 5, 2026
Work consists of: soil erosion & sedimentation control, including obtaining the sesc permit for the project; staking and layout of proposed improvements, with support and confirmation from engineer temporary water control measures as required; repair or replacement of steel radial gates including removal of existing hoist equipment and replacement with new hoist frame, cleaning and coating existing steel gates; cured-in-place lining of existing corrugated metal pipe culvert outlets within the dam; right embankment repair; grading and riprap installation along the downstream toe of the dam with bedding stone, filter sand, drainage stone and filter fabric; repair of spillway concrete including shallow and deep repairs and crack injection and route/seal; turf restoration for all areas disturbed during construction; restoration of gravel access route, if disturbed during construction, related work.