Higher EducationND
Posted
Sep 17, 2026
Oct 14, 2026
UND Campus Generator Upgrades RFP
Procurement of six standby generators and Automatic Transfer Switches (ATS) for various buildings.
Description: The project covers generator and automatic transfer switch upgrades at the NC Zoological Park, including related electrical and construction work. The owner-provided equipment is stored onsite, and bids must include moving it to the installation areas; the base bid covers the Veterinary Hospital and Wildlife Rehabilitation Center, with alternates for the Greenhouse complex and Desert Pavilion. This is a single-prime, lump-sum bid, with proposals due November 17, 2026, at 2:00 PM.
StateAgency · NC, US
Solicitation files and supporting documents for this bid.
RFP documents aren’t available here yet.
Our team can help you find the original solicitation documents.
Request File RetrievalAdjacent opportunities open for bidding right now.
Higher EducationND
Posted
Sep 17, 2026
Oct 14, 2026
Procurement of six standby generators and Automatic Transfer Switches (ATS) for various buildings.
Higher EducationND
Posted
Sep 17, 2026
Oct 14, 2026
Procurement of six standby generators and Automatic Transfer Switches (ATS) for various buildings.
Kenton County Airport Board, Contract & Procurement Administration
Special DistrictKY
Posted
-
Oct 29, 2026
Project includes the replacement of the emergency generators and fuel systems at South ARFF and Vault 12. At South ARFF, the legacy generator and UST would be replaced with an emergency generator sized in-kind with a belly fuel tank. At Vault 12, the two legacy generators inside of the building and UST would be replaced with one emergency generator with a belly fuel tank.
FederalDC
Posted
Sep 14, 2026
Nov 13, 2026
The Smithsonian Institution is seeking offers from prequalified firms to construct Phase 2—Habitats & Animal Care Building for the Arabian Leopard Facility at the Smithsonian National Zoological Park in Washington, DC. The firm-fixed-price construction contract is expected to exceed $10 million and includes specialized habitat, animal-care, building, and site-integration work with a 578-day performance period. This is an active construction solicitation, not a grant program, and proposals are due November 13, 2026, at 3:00 PM Eastern Standard Time.
Decision makers connected to this RFP from North Carolina Department of Natural and Cultural Resources.