Work inlcudes intersection improvements include construction of roundabout, widening, overlay, striping, and some drainage work.
Description: Work includes 18 SY removing concrete flumes, 253 LF removing curb and gutter, 2 EA removing inlets, 900 CY unclassified excavation, 197 CY borrow excavation (loose truckbed measurement)(a4 or better), 87 CY structure excavation, 13 CY foundation backfill, commercial, 135 Ton crushed aggregate, section 825, type b, for miscellaneous use, 13,895 SY planing existing pavement (approx 8.10" thru 9.0" thick), 1,847 SY planning existing pavement (approx 10.1" thru 11.0" thick), superpave bituminous concrete wearing surface layer, leveling, 3/4" maximum aggregate size mix, esal range c/d 50 Ton, 15,741 SY plain cement concrete pavement,12" thick. See attached file.
SpecialDistrict · AL, US
Solicitation files and supporting documents for this bid.
RFP documents aren’t available here yet.
Our team can help you find the original solicitation documents.
Request File RetrievalAdjacent opportunities open for bidding right now.
CountyMS
Posted
Oct 11, 2026
Nov 12, 2026
Work inlcudes intersection improvements include construction of roundabout, widening, overlay, striping, and some drainage work.
Alabama Department of Transportation
Special DistrictAL
Posted
Oct 9, 2026
Nov 6, 2026
Work includes 112 SY removing concrete driveway, 33 SY removing concrete pad, 359 SY removing concrete slab, 182 LF removing pipe, 462 LF removing guardrail, 4 EA removing guardrail end anchor (all type), 2 EA removing inlets (partial), 2 EA mailbox reset, single, 2,372 CY unclassified excavation, 1,790 CY borrow excavation (loose truckbed measurement), 500 Ton borrow excavation (underwater embankment), 62 CY structure excavation, 37 CY foundation backfill, commercial, 1,100 SY geosynthetic reinforcement for soft soil stabilization, type 2, 1,100 SY crushed aggregate base course, type b, plant mixed, 6" compacted thickness. See attached file.
CityNJ
Posted
-
Oct 15, 2026
This RFP is for labor, materials, and equipment required for roadway improvements on Millbrook Avenue.
Alabama Department of Transportation
Special DistrictAL
Posted
Oct 9, 2026
Nov 6, 2026
Work includes 350 LF removing guardrail, 2 EA removing guardrail end anchor (all type), 416 CY unclassified excavation, 395 CY borrow excavation (loose truckbed measurement)(a4 or better), 10 rbst roadbed processing, 320 Ton crushed aggregate, section 825, for miscellaneous use, 1,420 SY bituminous treatment a, 650 Gal tack coat, 4,895 SY planing existing pavement (approx 1.10" thru 2.0" thick), material remixing device, superpave bituminous concrete wearing surface layer, 1/2" maximum aggregate size mix, esal range c/d 695 Ton. See attached file.