Closing soon

UM UH B1F233 NIR 3 Replacement RFP

Description: Work includes approx 950 SF within the existing University Hospital Level B1 Neuro-Interventional Radiology Department, including NIR 3 Procedure Room F233, Control Room F232, and Equipment Room F233A. Work includes replacement and upgrade of the existing imaging equipment and monitors, installation of a new anesthesia utility head boom with associated power, data, and medical gas connections, and replacement of control room monitoring and control equipment. Architectural work includes selective demolition and new wall, ceiling, and floor finishes throughout the affected areas. Mechanical, electrical, and plumbing systems will be modified as required to support the new equipment. HVAC and lighting systems within the renovated spaces will be upgraded. Minor modifications to the existing fire alarm and sprinkler systems will be required to accommodate new ceiling-mounted equipment.

Buyer
University of Michigan Ann Arbor

HigherEducation · MI, US

Released
Oct 1, 2026
Closes
Oct 21, 2026(8 days left)

Files

Original attachments and procurement documents tied to this bid.

No files attached to this RFP.

Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.

Request File Retrieval
See your top accountsScan your site in seconds. Starbridge identifies your ICP and surfaces emerging opportunities from board meetings, job changes, new grants, contract expirations, RFPs, and more.
See your top 10 accounts