The Lock Up Storage Kapahulu RFP
Posted
Oct 14, 2026
Nov 5, 2026
6-Floor, 122,344 GSF state-of-the-art climate-controlled self-storage facility administrative/office areas and 18-stall on-grade parking lot beneath structure. Project scope includes structural steel and reinforced concrete building structure with CMU walls, insulated metal panels and built-up TPO roof system over a reinforced concrete mat foundation. Interior construction includes all finishes, locker partitions, vertical transportation, specialties, MEP and low-voltage security & communications systems. Fire Protection System and Fire Alarm System scopes are to be Design-Build. Scope also includes exterior earthwork, site utilities and hardscapes/landscapes.
