RFP Database

Find HVAC Control Systems RFPs and Bid Opportunities

Find open HVAC Control Systems RFPs from state agencies, local governments, school districts and higher ed institutions.

20 opportunities shown.

  1. Escanaba Housing Commission

    Special DistrictMI

    Commercial HVAC Controls & BAS Integration RFP

    Scope Summary: Furnishing and installing duct-mounted exhaust temperature sensors, hydronic reheat control valve and space sensor for hallway heating, associated BAS controller expansion modules, conduit, low-voltage wiring, programming, commissioning, and as-built documentation.

  2. Water Treatment Facility - HVAC Improvements

    Work includes removal and disposal of ACU-8 and associated ACC-2, ACU-9 and associated ACC-3, ACU-10 and associated ACC-5, ACU-11 and associated acc-6, ACU-7 and associated ACC-4, ACU-6 and associated ACC-1 and all associated refrigeration piping, piping accessories and supports serving the main water plant.

  3. King County

    CountyWA

    Shoreline Transfer Station Dust Control Project RFP

    Construct mezzanine partition wall; misting system modifications and controls; mezzanine supply fan installation; demolition of dust hood and duct capping; air barrier repairs; hvac testing and balancing; general conditions; contractor engineering; apprenticeship utilization incentive.

Recent buying indicators

Recent board meeting, budget, plan, and contract evidence, connected to the buyer and relevant decision-makers.

Why now

- The city council's budget committee is weighing three approaches to the police north building's mold crisis, with costs from roughly $17.5 million to $36 million. - The mold is traced to a malfunctioning makeup air unit and its controls, managed by an outside vendor, which the police chief says failed to maintain proper humidity levels. - The building has been vacant since late November or early December 2025, underscoring the urgency of the HVAC-related remediation. - The renovation scope would address HVAC issues comprehensively, including replacing plumbing, electrical lines, and air vents down to the light switch plate.

Meeting MentionPre-RFPDetected: Sep 29
Key Contacts · Verified by Starbridge
Lindsay Maureen Lacy
Accountant
Dorion Titus Pamplin
Accountant I

Why now

- The facilities team detailed persistent failures of 35-year-old HVAC equipment, including a 1990 chiller whose parts are no longer manufactured. - Humidity control failures in the 500 hallway classrooms have caused wet floors and hot rooms, disrupting learning conditions. - A chiller breakdown forced an e-learning day, underscoring the operational impact of the aging systems. - The district plans to present systematic solutions for its facilities issues at the next board meeting.

Meeting MentionPre-RFPDetected: Sep 23
Key Contacts · Verified by Starbridge
Josh Payton
504 Coordinator
Eric Koranda
Assistant Principal
See your top accountsScan your site in seconds. Starbridge identifies your ICP and surfaces emerging opportunities from board meetings, job changes, new grants, contract expirations, RFPs, and more.
See your top 10 accounts